Guy Nordenson
1955– · Structures of public buildings; adaptation of coastal cities (2010)
A structural engineer and Princeton professor, Guy Nordenson combines designing buildings with major architects and thinking about seismic safety and the adaptation of coastal cities to rising seas.
Biography
Born in 1955, Guy Nordenson studied at MIT and the University of California, Berkeley. He started out as a draughtsman in the studio of Buckminster Fuller and Shoji Sadao, then worked at Arup before founding his firm, Guy Nordenson and Associates, in 1997.
A professor of architecture and structural engineering at Princeton University, he was the first structural engineer elected to the American Academy of Arts and Sciences.
What he invented or proved
Nordenson designs the structures of museums and public buildings with leading architects, seeking coherence between structure and space. He helped reform New York’s seismic code.
With the study “On the Water: Palisade Bay”, he proposed soft strategies to protect New York harbour from storms and rising seas.
His works
- Museum of Modern Art expansion (2004), New York.
- Jubilee Church (2003), Rome, with Richard Meier.
- On the Water: Palisade Bay (2010), adaptation of New York harbour.
What we owe Guy Nordenson
Stronger floods, scour, coastal flooding: adapting structures to climate change is becoming part of our assessments and projects.
Sources
- Princeton University, School of Architecture, « Guy Nordenson »
- G. Nordenson, C. Seavitt, A. Yarinsky, « On the Water: Palisade Bay » (Hatje Cantz, 2010)
- G. Nordenson, « Patterns and Structure: Selected Writings » (Lars Müller, 2008)
Tester mes connaissances sur les grands bâtisseurs
See also
In our projects
A few structures of the same type studied by THEOREMS.
A28 motorway: detailed inspections and diagnosis for ALIS
Conversion of the Tranchasse canal bridge into a cycle route
Eurovélo 5 footbridge over the route de La Bassée
Reconstruction of the Rametz bridge over the Hogneau
Eure Departmental Council: detailed inspection of three structures
A1 and A26 motorways: refurbishment of 10 bridges