We carry out contractors’ detailed designs, during the preparation period as well as during construction: bridges, civil engineering and buildings.
Design basis reports, Eurocode calculation reports and construction drawings: our documents are designed to be approved quickly and built without surprises.
At tender stage, we help contractors price accurately: preliminary sizing, alternatives, quantities and reinforcement ratios.
On site, we stay alongside the site manager to adapt methods and deal with the unexpected.
Stability and integrity
- Shallow and deep foundations: footings, rafts, piles, micropiles
- Soil-structure interaction and subgrade moduli
- Retaining walls, diaphragm walls and sheet pile walls
- Forces, deformations and stresses in materials
- Calculations to the Eurocodes and their national annexes
- Checking of temporary stages and construction methods: lifting, launching, falsework, formwork
Advanced modelling
- Finite element models: beams, plates, shells, cables
- Linear and non-linear analysis, large displacements
- Construction staging, creep and shrinkage of concrete, prestressing
- Dynamic, spectral and time-history analysis
- Cracked-section analysis and fatigue checks
- Thermal effects, temperature gradients and restrained expansion
- Optimisation of structures and material quantities
Construction drawings
- Formwork and reinforcement drawings for reinforced and prestressed concrete structures
- Prestressing, equipment and construction-stage drawings
- Steelwork drawings and connection details
- 3D models and IFC exchanges (BIM) with Tekla Structures, AutoCAD and Revit
- Automatically generated bar schedules
- Detail sheets: bearings, expansion joints, block-outs, cast-in items
- Delivery formats suited to the contractor and to the checker
Calculation notes
- Design basis report drawn up from the specification and the geotechnical data
- Detailed, traceable calculation reports, from the model to the section checks
- Justification of temporary stages and of the contractor’s methods
- Quick revision after comments from the designer or the technical controller
- Hand checks of software results
- Systematic internal check before issue, by a checker other than the author
Related projects
Review of the construction design of a rail bridgeSaint-Denis-de-l’Hôtel (45)
Review of the construction design of the Warcq bridge over SNCF tracksWarcq (08)
Relocation of the A9 at Montpellier: review of noise barrier designMontpellier (34)
Railway noise barriers at Chelles and Vaires-sur-MarneChelles et Vaires-sur-Marne (77)