All projects

Review of the construction design of a rail bridge

Contrôle des études d’exécution d’un pont-rail

13.83 m clear span reinforced concrete box structure under the Orléans–Gien line, for the RD921 bypass.

As part of the RD921 bypass by the Loiret Departmental Council, a rail bridge is being built at Saint-Denis-de-l’Hôtel, at km 141+101 of the Orléans–Gien line.

The structure is a reinforced concrete box with a square clear span of 13.83 m and a length of 6 m, with independent wing walls. On a spread foundation with a 0.80 m wider raft, it has patterned formwork finishes.

Characteristics

  • Type: reinforced concrete box structure
  • Square clear span: 13.83 m; length: 6 m
  • Top slab: 0.89 m at mid-span, 0.80 m at the haunches

Services provided

  • Calculation notes: design basis, box, wing walls, equipment
  • Drawings: setting out, general arrangements, formwork, reinforcement, equipment, details

Photos

  • Review of the construction design of a rail bridge – view 1
  • Review of the construction design of a rail bridge – view 2
  • Review of the construction design of a rail bridge – view 3
  • Review of the construction design of a rail bridge – view 4

Similar projects