All projects

Diagnosis and rehabilitation of OA 5754 over the Saint-Quentin canal

Diagnostic et réhabilitation de l’OA 5754 sur le canal de Saint-Quentin

41 m Daydé bridge from 1928: corrosion of chords, water ingress, tilted abutment, repairs designed.

OA 5754, built in 1928, carries the RD96 over the Saint-Quentin canal. This steel structure with Daydé-type side truss girders is undergoing works scheduled progressively by the Departmental Council.

THEOREMS carried out its diagnosis, assessed its load capacity and designed the repair works: corrosion and perforation of the bottom chords, cross-members and stringers; water ingress at the footways; failed joints; about 14 mm tilting of one abutment; cracking of the wing walls due to differential settlement.

Characteristics

  • Type: Daydé-type side truss girders (1928)
  • Length: 41.02 m

Photos

  • Diagnosis and rehabilitation of OA 5754 over the Saint-Quentin canal – view 1

Similar projects