All projects

Rehabilitation of the Ranville bridge over the Orne

Réhabilitation du pont de Ranville sur l’Orne

82 m composite bridge in a marine environment: chloride and carbonation diagnosis, then design and project management of the full rehabilitation.

The RD514 bridge crosses the Orne at Ranville. This 82.20 m steel-concrete composite structure, with two continuous spans of 35.60 m, is exposed to an aggressive marine environment and shows many signs of ageing.

Investigations revealed chloride contents above the permissible thresholds in the abutments, locally thin concrete cover and a carbonation front that already reaches some reinforcement. THEOREMS is in charge of design and project management for the rehabilitation.

Characteristics

  • Type: composite bridge with two continuous spans
  • Length: 82.20 m (2 × 35.60 m)
  • Environment: marine site

Works

  • Removal of unsound concrete and patch repairs on the soffit
  • Blast cleaning and repainting of the steelwork
  • Replacement of kerbs and refurbishment of footways, with widening of the north footway for cyclists
  • Replacement of the parapet by a dual-function parapet
  • Repair and extension of drainage spouts
  • Renewal of waterproofing, surfacing and expansion joints
  • Jacking and replacement of bearings, rebuilding of plinths
  • Rebuilding of the ballast walls to remove the contact with the deck
  • Corrosion inhibitor and protective coating on concrete surfaces

Photos

  • Rehabilitation of the Ranville bridge over the Orne – view 1
  • Rehabilitation of the Ranville bridge over the Orne – view 2
  • Rehabilitation of the Ranville bridge over the Orne – view 3

Similar projects