Four-span prestressed box girder on the RN94, restricted to 70 t: feasibility of a 110 t crossing despite undersized hinge bars.
The Riou Bourdou bridge carries the RN94 over the torrent of the same name at Savines-le-Lac. Its prestressed concrete box girder deck, with hinges tied by prestressing bars, is restricted to 70 t because of a large load capacity deficit caused by undersized hinge tie bars.
At the request of the DIR, THEOREMS studied the feasibility of heavy loads of up to 110 t crossing.
Characteristics
- Spans: 45.10 – 59.60 – 59.60 – 49.55 m
- Prestressed box girder 3.30 m deep at the piers, 1.20 m at the hinges
Services provided
- Overall risk analysis
- Reassessment taking the construction sequence into account
- Precise calculation of the additional stresses in the bars
- Check of the feasibility of heavy load crossings
- Search for the best crossing conditions and recommendations




