Jean Muller
1925–2005 · Match-cast precast segments (Choisy-le-Roi, 1962–1965)
Freyssinet’s heir, Jean Muller industrialised the construction of prestressed concrete bridges: his precast segments have travelled the world.
Biography
Born on 25 May 1925 in the Paris region, Jean Muller graduated from the École centrale in 1947 and joined STUP, the company set up to exploit Eugène Freyssinet’s patents, working alongside Freyssinet. He took part in the arches of the Caracas–La Guaira motorway, then spent three years in the United States, which was just discovering prestressing.
Back at Campenon Bernard in 1955, he designed the Choisy-le-Roi bridge over the Seine, the first bridge built of match-cast precast segments, followed by the Oléron viaduct and the Brotonne cable-stayed bridge. In the United States his firm Figg and Muller designed the Seven Mile Bridge, the Linn Cove Viaduct and the Sunshine Skyway.
In 1988 he founded Jean Muller International, whose studies led in particular to the Confederation Bridge in Canada. He retired in 1994 and died on 19 March 2005.
What he invented or proved
At Choisy-le-Roi, Muller had each segment cast against the previous one: the face of one serves as the mould for the next. The joints match perfectly, with no mortar to pour on site, which speeds up erection and improves quality. Assembled by prestressing, precast segments became an industry.
He went on to develop span-by-span erection from one support to the next, external prestressing and concrete cable-stayed bridges of great purity of form.
His works
- Choisy-le-Roi bridge over the Seine (1962–1965): the first match-cast precast segments.
- Oléron viaduct (1966).
- Brotonne bridge over the Seine (1977): concrete cable-stayed bridge with a single plane of stays.
- Seven Mile Bridge and Sunshine Skyway, Florida (1980s).
- Confederation Bridge, Canada (1997), designed by his firm.
What we owe Jean Muller
Segmental bridges, built by balanced cantilever or span by span, are common on the motorway networks we inspect. Their joints, internal or external prestressing tendons and deviators are part of our detailed inspections and recalculations.
Sources
- Structurae, fiche « Jean Muller »
- AFGC, dossier de presse du centenaire de Jean Muller (2025)
- Travaux, « Jean Muller » (A. Dinis, association Jean M. Muller)
- D. Tassin, « Jean M. Muller: Bridge Engineer », PCI Journal, mars–avril 2006
Tester mes connaissances sur les grands bâtisseurs
See also
In our projects
A few structures of the same type studied by THEOREMS.
A28 motorway: detailed inspections and diagnosis for ALIS
A64 and A66 motorways: refurbishment of bridges
A62 and A10 motorways: replacement of joints and bearings
Rehabilitation of the Colombelles bridge (VIPP) over the Orne
Reconstruction of the Bateliers bridge over the Sambre
Rehabilitation of the Malraux viaduct in Poitiers