John Burland
1936– · Modified Cam-Clay (1968); stabilisation of the Leaning Tower of Pisa (1990–2001)
A professor at Imperial College London, John Burland contributed to the modified Cam-Clay model and saved the Leaning Tower of Pisa by patiently extracting soil from beneath its high side.
Biography
Born on 4 March 1936 in Buckinghamshire, John Boscawen Burland grew up in South Africa and graduated in engineering from the University of the Witwatersrand in 1959. Returning to England in 1961, he completed his doctorate at Cambridge under Kenneth Roscoe.
After years at Ove Arup & Partners and the Building Research Establishment, he became a professor at Imperial College. A Fellow of the Royal Society, he was appointed CBE in 2005.
What he invented or proved
With Roscoe, in 1968 Burland formulated the modified Cam-Clay model, still used in analysis software. He studied soil-building interaction and the effects of excavations and tunnels on neighbouring structures.
At Pisa he had small quantities of soil removed from beneath the north side: the tower slowly straightened and returned to its 1838 inclination.
His works
- Underground car park at the Palace of Westminster (1972–1974).
- Protection of the Big Ben tower during the Jubilee Line extension.
- Stabilisation of the Leaning Tower of Pisa (1990–2001), by soil extraction.
What we owe John Burland
Act little, slowly, measuring every effect: his approach at Pisa is a model for work on fragile old structures, which we prepare through instrumentation and monitoring.
Sources
- Imperial College London, « Professor John Burland »
- J. B. Burland, M. Jamiolkowski, C. Viggiani, « Stabilising the leaning tower of Pisa », Bulletin of Engineering Geology and the Environment (1998)
- J. B. Burland et al., « The Tower of Pisa: History, Construction and Geotechnical Stabilization » (CRC Press, 2020)
Tester mes connaissances sur les grands bâtisseurs
See also
In our projects
A few structures of the same type studied by THEOREMS.
A28 motorway: detailed inspections and diagnosis for ALIS
Conversion of the Tranchasse canal bridge into a cycle route
Abnormal load route in Lozère: 123 structures assessed
Eure Departmental Council: detailed inspection of three structures
Reconstruction of the Rametz bridge over the Hogneau
A1 and A26 motorways: refurbishment of 10 bridges