William Henry Barlow
1812–1902 · St Pancras train shed (1868), the largest span of its time; second Tay Bridge (1887)
An English railway engineer, William Henry Barlow roofed St Pancras station with the largest single-span arch of its time and designed the second Tay Bridge.
Biography
Born on 10 May 1812 in Woolwich, the son of the mathematician Peter Barlow, William Henry Barlow trained in the workshops of the London arsenal and docks, then worked for several years in Constantinople. Back in England, he became engineer to the Midland railways.
He designed the St Pancras train shed, completed the Clifton Suspension Bridge with John Hawkshaw in 1864 and sat on the court of inquiry into the Tay disaster. President of the Institution of Civil Engineers in 1879–1880, he died at Charlton on 12 November 1902.
He also patented a saddle-shaped rail laid directly on the ballast.
What he invented or proved
At St Pancras, Barlow spanned about 73 metres with a single lattice iron arch, with no intermediate support. The arches are tied below track level, within the floor covering the beer vaults: the thrust is taken without buttresses.
After the fall of the first Tay Bridge, he designed with his son Crawford the second, massive and cautious bridge, opened in 1887.
His works
- St Pancras train shed (1868), London: a span of about 73 metres.
- Completion of the Clifton Suspension Bridge (1864), with John Hawkshaw.
- Second Tay Bridge (1887), with his son Crawford Barlow.
What we owe William Henry Barlow
Tied arches, long-span steel roofs: checking them means inspecting the ties and their anchorages, often hidden. It is a constant focus of our assessments of old structures.
Sources
- Institution of Civil Engineers, « William Henry Barlow »
- Oxford Dictionary of National Biography, « Barlow, William Henry »
- Structurae, fiche « Gare de Saint-Pancras »
- Grace’s Guide, « William Henry Barlow »
Tester mes connaissances sur les grands bâtisseurs
See also
In our projects
A few structures of the same type studied by THEOREMS.
Eurovélo 5 footbridge over the route de La Bassée
Reconstruction of the Pipes bridge over the Cusancin
Pontoons and suspended footbridge under boulevard Schuman
Montpellier Méditerranée Métropole: diagnosis of 60 bridges
Jacking and strengthening of a bridge over railway lines
Diagnosis and rehabilitation of OA 5754 over the Saint-Quentin canal