All projects

Diagnosis of OA 6313 over the Haute-Colme canal

Diagnostic de l’OA 6313 sur le canal de la Haute-Colme

Daydé bridge from 1928: well designed for its time, it is limited to 19 t once corrosion is taken into account, as the load tests confirm.

OA 6313, built in 1928, carries the RD11 over the Haute-Colme diversion canal at Looberghe. This heavily weakened steel structure with Daydé-type side trusses had already been subject to a weight restriction and local strengthening.

The checks showed a structure correctly designed for the 1927 loads. Under Fascicule 61 Title II loads, the top chords exceed the stability limits by 23%; with corroded sections, the structure must be restricted to 19 t. Load tests with 26 t lorries and agricultural convoys confirmed these limits.

Characteristics

  • Type: Daydé-type side truss girders (1928)

Photos

  • Diagnosis of OA 6313 over the Haute-Colme canal – view 1
  • Diagnosis of OA 6313 over the Haute-Colme canal – view 2
  • Diagnosis of OA 6313 over the Haute-Colme canal – view 3
  • Diagnosis of OA 6313 over the Haute-Colme canal – view 4

Similar projects