Heavily corroded 1925 steel bridge: residual load capacity by finite element analysis and weight restriction pending the works.
Bridge D0390 carries the RD672 over the Saint-Quentin canal at Omissy. Built in 1925, this 36 m span steel structure showed many progressive defects at the 2015 and 2018 inspections: advanced corrosion of the joints with perforations, section loss, deformation.
THEOREMS determined its residual load capacity so that a weight restriction could be introduced pending the works.
Characteristics
- Type: steel bridge from 1925
- Span: 36 m
Services provided
- Site visit and assessment of the defects recorded during inspections
- First- and second-order finite element models
- Reassessment with intact sections, then with sections weakened by corrosion
- Original loads (1925), Fascicule 61 Title II, restrictions to 19, 12 and 9 t…
- Stability checks (lateral-torsional buckling, plate buckling, flexural buckling)
- Repair works, costed scenarios and programmes