Reassessment of steel bridge D0390 over the Saint-Quentin canal

Recalcul du pont métallique D0390 sur le canal de Saint-Quentin

Heavily corroded 1925 steel bridge: residual load capacity by finite element analysis and weight restriction pending the works.

Bridge D0390 carries the RD672 over the Saint-Quentin canal at Omissy. Built in 1925, this 36 m span steel structure showed many progressive defects at the 2015 and 2018 inspections: advanced corrosion of the joints with perforations, section loss, deformation.

THEOREMS determined its residual load capacity so that a weight restriction could be introduced pending the works.

Characteristics

  • Type: steel bridge from 1925
  • Span: 36 m

Services provided

  • Site visit and assessment of the defects recorded during inspections
  • First- and second-order finite element models
  • Reassessment with intact sections, then with sections weakened by corrosion
  • Original loads (1925), Fascicule 61 Title II, restrictions to 19, 12 and 9 t…
  • Stability checks (lateral-torsional buckling, plate buckling, flexural buckling)
  • Repair works, costed scenarios and programmes

Photos

  • Reassessment of steel bridge D0390 over the Saint-Quentin canal – view 1
  • Reassessment of steel bridge D0390 over the Saint-Quentin canal – view 2
  • Reassessment of steel bridge D0390 over the Saint-Quentin canal – view 3

Similar projects