All projects

Diagnosis of the steel bridge at the Acquigny leisure park

Diagnostic du pont métallique de la base de loisirs d’Acquigny

1920s truss girder bridge over the Eure: condition survey before rehabilitation.

The steel bridge of the Acquigny leisure park crosses the Eure. Built in the early 1920s, it has two continuous 24.13 m spans with side truss girders.

Flaking paint, expansive corrosion at the joints, perforated deck plates, missing rivets, non-compliant parapet: THEOREMS surveyed its condition before the rehabilitation works.

Characteristics

  • 2 continuous spans of 24.13 m
  • Usable width between girders: 4.51 m

Photos

  • Diagnosis of the steel bridge at the Acquigny leisure park – view 1

Similar projects