1980s truss girder footbridge: condition survey and costing of corrosion protection works.
The VDR22 footbridge carries pedestrians over avenue des Falaises at Val-de-Reuil. Built in the early 1980s, it consists of side steel truss girders and a reinforced concrete slab.
Flaking paint, expansive corrosion of cross-members and bearings, spalling with exposed reinforcement on the piers, deformed parapet: THEOREMS surveyed its condition and costed the corrosion protection works.
Characteristics
- 3 spans of 15.40 – 27.60 – 16.40 m
- Usable width: 3.46 m