Benjamin Baker
1840–1907 · Forth Bridge (1890), steel cantilevers designed against wind
A British engineer, Benjamin Baker designed with John Fowler the Forth Bridge, a giant steel cantilever conceived to resist the wind after the Tay disaster.
Biography
Born on 31 March 1840 at Keyford, near Frome, Somerset, Benjamin Baker trained at an ironworks in Wales, then joined John Fowler’s office in 1862, later becoming his partner. He worked on the London Underground, then built by cut-and-cover.
After the Tay Bridge collapsed in 1879, he designed with Fowler the railway bridge over the Forth, completed in 1890. He was then consulting engineer on many works, including the first Aswan Dam.
Knighted in 1890 and President of the Institution of Civil Engineers, he died at Pangbourne on 19 May 1907.
What he invented or proved
To cross the Forth, Baker chose steel-tube cantilevers linked by suspended spans: three great balanced structures, able to carry trains and withstand storms with a stiffness the Tay Bridge lacked.
He carefully studied wind pressure, which he measured on site, and the thermal movement of large steel structures. The bridge was one of the first great steel bridges in Europe.
His works
- London Underground (Metropolitan and District Railways), with John Fowler.
- Forth Bridge (1890), Scotland: two cantilever spans of 521 metres.
- Cylinder vessel that carried Cleopatra’s Needle to London (1877).
- First Aswan Dam (1902), Egypt, as consulting engineer.
What we owe Benjamin Baker
Wind is a load in its own right, one the Tay disaster taught engineers to take seriously. Our checks of metal structures and exposed equipment, parapets, screens, gantries, include it according to Eurocode 1.
Sources
- Structurae, fiche « Benjamin Baker »
- Institution of Civil Engineers, « Sir Benjamin Baker »
- Network Rail, « The Forth Bridge »
- Unesco, « The Forth Bridge » (2015)
Tester mes connaissances sur les grands bâtisseurs
See also
In our projects
A few structures of the same type studied by THEOREMS.
Eurovélo 5 footbridge over the route de La Bassée
Reconstruction of the Pipes bridge over the Cusancin
Pontoons and suspended footbridge under boulevard Schuman
Montpellier Méditerranée Métropole: diagnosis of 60 bridges
Jacking and strengthening of a bridge over railway lines
Diagnosis and rehabilitation of OA 5754 over the Saint-Quentin canal